The Anteck engineering team installing a floating floor isolation system on an overseas project, with turnkey delivery from design through commissioning.

Project Highlights

  • Exported to six countries and regions
  • On site installation and commissioning
  • Floating floor vibration isolation
Get a Quote

Anteck products are exported to the United States, Japan, Mexico, India, Vietnam, Taiwan and other countries and regions. For overseas projects we do more than ship the equipment: we send an engineering team to site for installation and commissioning, so the laboratory reaches its design figures in its real local setting.

In this photo the team is laying the spring isolation units for a floating floor, which is the step that keeps low frequency vibration out of an anechoic or reverberation chamber. We hold every overseas project to the same build standard and support third party acoustic testing at the acceptance stage.